3 TPD Biodiesel Plant Equipment List&Quotation

You are here: Home » Quotations » 3 TPD Biodiesel Plant Equipment List&Quotation
3 TPD Biodiesel Plant Equipment List
No. Equipment Name Specs. Texture Qty. (set)
Pretreatment, Esterification,Transesterification & Glycerin Processing Section
1 Sulfuric acid metering tank 0.1m3 Q235B 1
2 Esterification reactor 6m3 Enamel 1
3 Demister 0.5m3 SS304 1
4 Condenser tube 20m2 SS304/Q235B 1
5 Alkali tank 2m3 SS304 1
6 Neutralizing tank 1m3 Q235B 1
7 Crude Methanol temporary storage tank 3m3 Q235B 1
8 Heater 30m2 SS304/Q235B 1
9 Condenser coil 15m2 SS304 1
10 Crude methanol receiving tank 0.5m3 SS304 1
11 Mixer DN50 SS304 1
12 Strong cavitator DN200 New material 1
13 Gas distributing cylinder Φ219 Q235B 1
14 Hot water tank 1m3 Q235B 1
15 Sulfuric acid storage tank 2m³ Q235B 1
16 Alkali tank 0.1m³ Q235B 1
Crude Methyl Ester Refining Section
1 Roots vacuum system 1 set Including vacuum tank 1
2 Fractionation tower Φ500×7000 SS304 Including over head condenser and tower packing material 1
3 Heat exchanger 10㎡ SS30408 1
4 Condenser 10㎡ SS304/Q235B 1
5 Biodiesel temporary storage tank 0.5m³ SS30408 1
6 Light component temporary storage tank 0.5m³ SS30408 1
7 Light component condenser 5㎡ SS30408 1
8 Reheater 30㎡ SS304/Q235B 1
Methanol Distillation
1 Methanol tower SS30408 1
2 Reheater 10 m2 SS304/Q235B 1
3 Overhead condenser 15 m2 SS304/Q235B 1
4 Condenser 10 m2 SS30408 1
5 Methanol refulx tank 0.2 m3 SS30408 1
6 Pump sets 18
7 Valve units 1
8 Instruments 1
9 Boiler 1
10 Cooling water tower 100m³ 1
11 Installation and debugging
12 Inland charges